Short term plan
Date and Time | Location | Risk Assessment (Health and Safety) | Costume/Props Needed | Equipment Needed |
25/02/12 1 – 4pm Sunny | Harrow St Anns shopping centre Location is public and can film without permission | All crew are healthy and fit to film Breaks and food (Fast food restaurants nearby) Equipment carried in bags and monitor equipment in crowds of people | Presenter: Casual clothing Props: Image from GTA for public interviews | Camera, tripod |
26/02/12 1-5pm sunny | Harrow St Anns shopping centre Location is public and can film without permission | All crew are healthy and fit to film Breaks and food (Fast food restaurants nearby) Equipment carried in bags and monitor equipment in crowds of people | Presenter: Casual clothing Props: Image from GTA for public interviews | Camera, tripod |
Long term plan
Week 1 from 7th April | Week 2 | Week 3 |
Evaluation of third draft. Start filming. | Start editing the draft. Film again if necessary. | Finish opening sequence and finish evaluation. |
No comments:
Post a Comment