Sunday 26 February 2012

Short term and long term plan for final draft

This plan will help us to organise our time properly and to be able to finish filming for the deadline.

Short term plan

Date and Time
Location
Risk Assessment (Health and Safety)
Costume/Props Needed
Equipment Needed
25/02/12
1 – 4pm
Sunny
Harrow St Anns shopping centre

Location is public and can film without permission
All crew are healthy and fit to film

Breaks and food (Fast food restaurants nearby)

Equipment carried in bags and monitor equipment  in crowds of people
Presenter:
Casual clothing

Props:
Image from GTA for public interviews
Camera, tripod
26/02/12
1-5pm
sunny
Harrow St Anns shopping centre

Location is public and can film without permission
All crew are healthy and fit to film

Breaks and food (Fast food restaurants nearby)

Equipment carried in bags and monitor equipment  in crowds of people
Presenter:
Casual clothing

Props:
Image from GTA for public interviews
Camera, tripod



Long term plan
Week 1
from 7th April
Week 2Week 3
Evaluation of third draft.
Start filming.
Start editing the draft.
Film again if necessary.
Finish opening sequence and finish evaluation.

No comments:

Post a Comment